Power Distribution testing underway

Post by mingstar »

Our provider is performing tests on the power distribution system for the facility that houses our machine. Our site is fully redundant, at least that's what we expect, so we shouldn't be bothered by it very much. Nonetheless, I'm keeping on contact with them as their testing proceeds.

If we're up and down some today, don't be surprised or worried.

Larry
User avatar
Miriam2
Posts: 4387
Joined: Fri Nov 14, 2014 10:51 am

Re: Power Distribution testing underway

Post by Miriam2 »

Thank you for the heads-up Larry.

And thank you for keeping the BH server happy and humming :happy
User avatar
LadyGeek
Site Admin
Posts: 95686
Joined: Sat Dec 20, 2008 4:34 pm
Location: Philadelphia
Contact:

Re: Power Distribution testing underway

Post by LadyGeek »

FYI - The tests will be repeated tomorrow, Sep 25.
Wiki To some, the glass is half full. To others, the glass is half empty. To an engineer, it's twice the size it needs to be.
Topic Author
mingstar
Founder
Posts: 176
Joined: Sun Mar 11, 2007 7:35 am

Re: Power Distribution testing underway

Post by mingstar »

We have just added a second network interface and configured the host to take advantage of our provider's HSRP infrastructure.
Our power system has been redundant for a long time. Now our networking infrastructure is also fully redundant.

Larry

"The major difference between a thing that might go wrong and a thing that cannot possibly go wrong is that when a thing that cannot possibly go wrong goes wrong it usually turns out to be impossible to get at or repair." -- Douglas Adams in "The Hitchhiker's Guide To the Galaxy"